Coexistence Studies and Risk Analysis

Release of location and realization of the coexistence conditions between DJ 142J Seica Mare - Seica Mica and OHL 400 kV Iernut - Sibiu, phases: 
coexistence study, SF, PT + CS, PAC

Coexistence study 110 kV OHL with Somes and Cluj-Napoca leisure base

- the coexistence study was elaborated on the basis of the specific topographic measurements that were performed, of the survey of the existing installations, of the data 
provided by the manager of the electrical installations and of the plans received from the designer of the objectives.

- it identifies the existing and the projected objectives, which are in the vicinity, or which are over-crossed / under-crossed by the existing electrical networks and it is 
analyzed the way in which the coexistence conditions provided by the technical regulations are fulfilled

- the necessary works in the electrical networks are determined for the regulation of their coexistence and their evaluation

Coexistence study for inhabited buildings in the Borhanci Nord area with 110 kV OHL Cluj Sud - Alverna, Cluj county

Regulation of 400kV OHL crossing Gadalin - Cluj East at km 22 + 675 on the Cluj-Est bypass variant, phases: coexistence study, SF, PT + CS

Preparation of the coexistence study of the 220kV OHL Rosiori-Vetis with the modernization of DJ 195, Satu Mare County

Coexistence study 400 kV OHL Iernut - Gadalin with PUG Valea Larga locality, Mures county