Medium and Low Voltage Electrical Networks RMJT

Modernization of 20 kV Petresti OHL from the 110/20/6 kV Gaesti substation, phases: SF, PTE, PAC

In the first stage, the 2.4 km OHL 20 kV survey was carried out: poles, conductors, insulators, earthing sockets, equipment.Topographic surveys were performed 
and mechanical verification calculations were performed. At the SF phase, 2 technically feasible scenarios were proposed for which economic evaluations, cost-effectiveness
analyzes, economic sensitivity analyzes were performed. At the PTE phase, the works of the scenario approved by SF were detailed.
Normalization of voltage level in Marca locality, Salaj county, phases: SF, PTE, PAC
In the first stage, the 5.9 km 0.4 kV OHL survey and 525 connections were made: poles, conductors, insulation, earthing, non-modernized connections. 
Options were sought for a 20 kV connection and a substation in the outer area of ​​the commune. At the SF phase, 2 technically feasible scenarios were proposed for 
which economic evaluations, cost-effectiveness analyzes, economic sensitivity analyzes were performed. At the PTE phase, the works of the scenario approved by SF 
were detailed.
Switching the network from 10 kV to the higher voltage 20 kV from place. Breaza, SF phase
In the first stage, the survey for 8.85 km LES 20 kV and 14 transformation stations was carried out: new route LES 20 kV + FO, PTZ / PTAB condition, equipment,0.4 kV
departures, integration in SCADA. At the SF phase, 2 technically feasible scenarios were proposed for which economic evaluations, cost-effectiveness analyzes, economic
sensitivity analyzes were performed. At the PTE phase, the works of the scenario approved by SF were detailed.
PTZ modernization and introduction in SCADA in Satu Mare county, phases: SF, PT + CS, PAC

The survey was carried out at 7 PTZ in Satu Mare municipality: condition of buildings, 20 kV connections, 0.4 kV connections, own services metering, SCADA integration. 
In the SF phase, 2 scenarios were proposed that involve ensuring a new life cycle for the 7 positions. At the PTE phase, the approved works were detailed in the scenario 
approved at SF and the sizing calculations of the equipment and materials used were performed.
Electricity supply to consumers in the Buzau Ring Road area, phases: SF, PT + CS, PAC

In the first stage, the survey was carried out for 5 transformation stations: new 20 kV SLE route, equipment, 0.4 kV departures, integration in SCADA. At the SF phase, 
2 technically feasible scenarios were proposed for which economic evaluations, cost-effectiveness analyzes, economic sensitivity analyzes were performed. 
At the PTE phase, the works of the scenario approved by SF were detailed. The works of the approved scenario consist in the installation of a new 20 / 0.4 kV PTAB, 
the replacement of a 20 / 0.4 kV PTA with a 20 / 0.4 kV PTAB, the equipping of the stations with new equipment necessary to switch to 20 kV, the restoration of some 
portions of low voltage circuits and laying of 5.5 km of 20 kV SLE.
Switching to 20kV of the distributor "DACIA SERVICE" Cluj-Napoca, phases: SF, PT + CS

In the first stage, the survey was carried out for 5 km 10 kV SLE and 16 transformation stations: new 20 kV SLE route, PTZ / PTAB condition, equipment, 0.4 kV departures,
integration in SCADA. At the SF phase, 2 technically feasible scenarios were proposed for which economic evaluations, cost-effectiveness analyzes, economic sensitivity 
analyzes were performed. At the PTE phase, the works of the scenario approved by SF were detailed.
Switching to 20kV of the distributor ,, MEBERO '' and ,, BUNA ZIUA '' Cluj-Napoca, phases: SF, PT + CS

In the first stage, the survey was performed for 13.5 km LES 10 kV and 20 transformation stations: new route LES 20 kV, PTZ / PTAB condition, equipment, 0.4 kV 
departures, integration in SCADA. At the SF phase, 2 technically feasible scenarios were proposed for which economic evaluations, cost-effectiveness analyzes, economic 
sensitivity analyzes were performed. At the PTE phase, the works of the scenario approved by SF were detailed.