Major maintenance LEA 400 kV Rosiori - Gadalin, phases: ET, DALI, PT + CS, DTAC
In the first stage, based on the technical characteristics of the line, the technical expertise of the OHL elements was performed: poles, sockets, foundations, active and
protective conductors, clamps and fittings, insulator chains. The expertise was made on the basis of visual observations, computerized verification calculations, mechanical
strength of the poles and by mechanical and electrical tests of some samples of conductors, clamps, fittings and insulators taken from the line.
Also, by performing some topographic measurements and some calculations, the coexistence of 400kV OHL with other objectives (crossings and approximations) was
analyzed. At the end of the expertise, it was proposed to carry out works to remedy the deficiencies found.
In the following phases, DALI, PT + CS were developed and detailed from a technical and economic point of view in accordance with the legal content norms, the works
approved by the Technical Expertise.
Maintenance of major LEA 400 kV Rosiori - Mukacevo, phases: ET, DALI, PT + CS, DTAC
220kV LEA repair Iernut - Ungheni, phases: SF, PT + CS
Major maintenance of LEA 220kV Cluj Floresti - Alba-Iulia; Cluj Floresti - Campia Turzii; Campia Turzii - Iernut, phases: ET, DALI, PT + CS, DE
Relocation of 110 kV networks from Somes Recreation Base, Cluj Napoca, SF phase
Modernization of LEA 110 kV Craiova East - DIF, Dolj County, phases: ET, SF, PT + CS, AC