Arrangement of personal building in 110/20 kV Zlatna substation, Alba county, PT + DE phase
Preparation of economic part, specifications, technical project and execution details. for: Non-structural interior partitions, construction / construction of gaps in masonry 
structural walls, change of carpentry, restoration of finishes and plasters, restoration of electrical installations, replacement of sanitary ware, construction of natural 
ventilation and furniture equipment.
Technical expertise and geotechnical study for 110 kV OHL poles A. Vlaicu - Dumbraveni, Sibiu county
Making the RLV for all metal poles and drawing up the observation sheets related to them. Identification of all degradations of concrete elements (foundations) and metal 
elements (pillars). Exemplification of the degrees of damage and identification of optimal rehabilitation solutions. Explaining the repair methods on the identified areas.
Construction of a roof with a frame in the 110/20 kV Agnita substation, Sibiu county, PT + DE phase
Preparation of economic part, specifications, technical project and execution details for: demolition of the existing wooden roof type roof and construction of a new wooden 
roof type roof, with fireproofing of all elements. Replacing the existing roof with a new one, with a system of gutters and downspouts compatible with it.
Subsidizing the foundations for taking over the loads from the designed roof.
Realization of a system of gutters for the evacuation of the waters from precipitations from the location of the foundations.
110/20 kV Dumbrava substation building repair, Sibiu county, PT + DE phase
Preparation of economic part, specifications, technical project and execution details for: perimeter sidewalk repairs, access stair repairs, design of new access stairs, 
realization of enclosure of concrete panels, carpentry works, recompartmenting, restoration of plasters and finishes, sanitation rooms, realization.
Modernization of PL Aiud headquarters building, Alba county, phases: SF, PT + CS
Preparation of feasibility study, economic part, specifications and technical project for: restoration of wooden roof, replacement of the existing roof and the system of 
gutters and downspouts, restoration of plasters and exterior and interior finishes, repair of perimeter sidewalk, fencing and access roads , carpentry works, treatment of 
archive type rooms, construction of fire detection and warning installations, burglary detection installations, video surveillance and access control installations, restoration 
of heating installations, sanitary installations and lightning protection installations.
Thermal rehabilitation and repair of roofs for the construction of the Prut-Barlad Water Basin Administration headquarters, in Iasi Municipality, phases: ET, DALI
Thermal coating of office buildings, replacement of wooden roofs, replacement of existing roofs and gutters and downspouts, restoration of perimeter protection sidewalks, 
carpentry work, restoration of exterior access roads in buildings and restoration of exterior finishes.
Energy efficiency works kindergarten building, Mihai Eminescu street - PT + DE phase
Increasing the energy efficiency of school, workshop and gymnasium buildings with recovery base within the Samus Special Technological High School - preparation phase:
DTAC + DTAD + DTOE